I didn't mention it yesterday, but I thought at some point watching the video, how wonderful it would be to have Messi play at the new Camp Nou.
Be it as a veteran contract for a season or simply a testimonial match.
All of us deep down want this to be true
Ferran on YT has a nice update on the status of interior work of Camp Nou - definitely a lot of progress ahead to get the dressing rooms and interior spaces ready for even the partial reopening in September (4 months). This seems fairly achievable but surprised that seemingly little progress has been made with those spaces for several weeks now - priority has clearly been on other aspects of renovations
The pitch looks increasingly like a pitch ready for football which is consistent with the estimation that within 10 weeks after being laid it would be ready for play
LED banners across lower ring looks 75% complete and many have probably seen the night testing that looks well advanced as well
The first two tiers are mostly completed with some detailed work around the bocas still ongoing, the 1st VIP ring that needs to advance well by June 30 and the outer ring is predominantly in place with the last ring around 30% bolted in
The perimeter of the stadium will need to clear paths to permit fans to come/go without incident but they have been incredibly efficient in this logistical aspect with the construction crew
By September, Camp Nou should be more or less ready to re-open, permits permitting. The 60k seating will surely be done with most of the outer top ring work in place (Will they cover it for matches with something? We’ll see)