Madrid had way less work with their renovation. All they did was dig a hole to hide their pitch, build a roof and hang the cheap plastic cover around the stadium so it appears new.Madrid returned to Burnacow after 18 months.
We're behind. I know. Excuses. Scamdemic, Turks being slow, high price of rebar, Tebas.
Just like for everything else. But I do want this club to be held to the highest standard.
Get to work.
Dude, pls I hope you're wrong - 2026 summer it fucking needs to be done!No chance it's done by 2026, which is normal.
2027
Nearly no chance for that. This was the original timeline, no construction goes without delays. Even when the stadium opens, they need to finish both VIP rings, the entire third stand, third cat-walk and the roof. Not forgetting all the diamond buildings surrounding the stadium. Also hundreds of stairs, dozens of elevators, electricity, painting, plumbing, safety measures like against fire hazard, outside covers for all 3 floors, new stores and and and. There is still a ton of work to do. Winter 26 would be good, could extend to summer 27.Dude, pls I hope you're wrong - 2026 summer it fucking needs to be done!