Stadium is so advanced now .. while would they need 14 months for full capacity ? (End of 26). Pre fabricated Stands are getting installed very rapidly nowadays and most superpillars are concreted from bottom to top ! Do interior works need 14 months 🤔Joan Laporta: “I believe we will get the Phase 1C permit (60.000 capacity) by the end of this year. The stadium will be fully completed with full capacity (105.000) by the end of 2026. The roof will need about 3½ months to be lifted. We have to find the right moment to do that without disrupting the team during the season, and we’ll decide later when it’s best. But full capacity (105.000), unless something unexpected happens, should be ready by the end of 2026.”
He should just stop talking about long term timelines...
It's reserved for that LGBTQ animation crowd. My guess is the club hasn't assembled the cast, yet. 1 300 kids.Why was the lowest part behind the goal closed and covered today?
Looks slightly increased, yes.The distance between the stands and the pitch has increased, hasn’t it?
And there are two gaps behind the end stand now as well.
I dont like it.